See What a Risk Radar Reveals About a $2.85B Project.
Download a real, anonymised sample from an IQRM engagement on a GCC EPC project. This is exactly what a Project Director receives: the forecasts, the scenarios, the action list.
See what a Risk Radar assessment looks like on a real project.
First name / Last name:
Business Email:
Job Title
Organization Name
Eight pages. Every decision your steering committee needs.
This is not a methodology overview or a marketing brochure. It is an anonymised extract from a live Risk Radar engagement on a $2.85B GCC EPC project.
-
1S-Curve Forecast showing deterministic vs probabilistic completion across 10,000 Monte Carlo iterations
-
2Top 10 Risk Drivers ranked by actual schedule impact in calendar days, not workshop opinions
-
3EPC Progress Gap showing planned vs actual across engineering, procurement, and construction
-
4Risk Data Engine Health with colour-coded scores showing which parameters need intervention now
-
5Supply Chain Impact including port status, purchase order risk levels, and required actions for the Strait of Hormuz disruption
-
6Three Scenarios with specific delay, cost overrun percentages, and projected completion dates
-
7Steering Committee Action Table with 10 required decisions, owners, and deadlines
This is something we needed but we didn't know how to ask for.
Project Director, EPC Refinery Upgrade
What the Risk Radar Has Changed
Real outcomes from real engagements, anonymised for confidentiality.
"A risk model without a traceable, quantifiable foundation is not an analysis. It is an opinion with a histogram attached."
IQRM · Institute of Qualified Risk Managers · info@iqrm.net · www.iqrm.net
Policy Pages
Get in touch

Copyright © 2026
